Jump to content
HybridZ

CHEQUERED FLAG JOE

Members
  • Content count

    43
  • Donations

    470.00 USD 
  • Joined

  • Last visited

  • Days Won

    4
  • Feedback

    0%

CHEQUERED FLAG JOE last won the day on January 26

CHEQUERED FLAG JOE had the most liked content!

Community Reputation

5 Neutral

About CHEQUERED FLAG JOE

  • Rank
    Moving Up

Contact Methods

  • Website URL
    http://www.modern-motorsports.com

Profile Information

  • Gender
    Male
  • Location
    Chatsworth Ca 91311

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

Enable
  1. CHEQUERED FLAG JOE

    Stub Axles 27 and 39 spline also Z31 conversion

    Hi Jon, yes the same ones I have been selling. Z31 HALF SHAFTS Z 31 half shafts are designed to allow you to install the Z31 CV into your 1970-1978 Z car. They are made out of 4340, heat treated and black zinc coated. They are the correct size so no need to flip your CV cages. That doesn't get you the correct amount of spacing.
  2. CHEQUERED FLAG JOE

    Stub Axles 27 and 39 spline also Z31 conversion

    All parts are new with the exception of the used Z31axle assemblies. Joe
  3. CHEQUERED FLAG JOE

    Drive shaft shop CV conversion doesn't fit!

    Hi Guys, there is big differances with CVs. If parts wern't heat treated they would self destruct in no time. My kit is priced the way it is as I only use good quality parts. This is the CVs I use in my kit. http://www.rcvperformance.com/product-details.aspx?sku=301174M-28M As you can see they are $265.00 each that's almost a 1/3 of the cost of my kit. http://www.modern-motorsports.com/datsun-240z-280z-complete-cv-axle-conversion.html Joe
  4. CHEQUERED FLAG JOE

    Dual Brake Master Cylinder with Balance Bar

    Hi Guys, forgot to mention I have kits fpr the S30 to convert to twin brake master cyl with balance bar in stock. Thanks Joe
  5. Hi Guys, just want to let you know I have. Stub Axles both 27 and 39 spline in stock. Z31 flanges both 27 and 39 are in stock. Used Z31 axles assemblies in stock. Correct length Z31 1/2 shafts in stock. Also my 930 CV conversion kit will be in stock soon. Waiting on one part to complete my conversion kit. Thanks Joe
  6. CHEQUERED FLAG JOE

    Drive shaft shop CV conversion doesn't fit!

    Jim, if I can help let me know. Joe
  7. CHEQUERED FLAG JOE

    Shortened CV Driveshats in MMS flange package?

    I have them in stock. Joe
  8. I have them in stock. Give me a call. Joe
  9. CHEQUERED FLAG JOE

    Z31 conversion kit

    I am picking up a good set of used Z31 CVs this weekend. So I can sell a almost complete kit. 2 39 spline stub axles 2 39 spline Z31 companion flange adapters 2 half shafts 2 used Z31 CV axles. Contact me for pricing Thanks Joe
  10. CHEQUERED FLAG JOE

    Companion flange 27 spline idea

    So sorry if I offended anyone with my input. Good Luck Happy Holidays Joe
  11. CHEQUERED FLAG JOE

    Companion flange 27 spline idea

    We are good. Happy Holidays Joe
  12. CHEQUERED FLAG JOE

    Companion flange 27 spline idea

    Thanks Happy Holidays Joe
  13. CHEQUERED FLAG JOE

    Companion flange 27 spline idea

    NewZed, there is one source making the parts. The other places are in the same boat they need to order 10 parts at a time. In fact they both have bought from me. I spoke to one of the guys in Canada 4 months ago nice guy forgot his name and have an email from Ryan in Oct looking for parts. If it can be done cheaper that's great Ill join in. The old days of ordering parts is gone. The manufacture would make and keep the parts in stock. I could order 2 parts at a time. Heck they even dropped shipped for me. Now I have to order 10 parts per item number and wait till the last one sells to make a profit. These are parts for vintage Datsuns as you know. They don't sell like Hot Cakes LOL So to have full stock your talking about 120 parts. 50K ++ not a good investment. ANY INVESTOR OUT THERE LOL I'm here to help if I can. Happy Holidays Joe
  14. CHEQUERED FLAG JOE

    27 spline CV hub adaptors

    I would be happy to have a run made. It would take a deposit of 50% and at least 4 orders. I could sell them at a 10% discount. It will take 9-10 weeks to make. Happy Holidays Joe
  15. CHEQUERED FLAG JOE

    Companion flange 27 spline idea

    Out of stock doesn't mean i cant get them. It takes 9 week for the manufacture to make a run of ten for me. Happy holidays Joe
×