Jump to content
HybridZ
Fauxre

Vacaville Velo Rossa

Recommended Posts

I though I was being flippant with that last remark.  

As it turned out only one of the concrete contractors, that had previously bid the project, even bothered to respond with their availability. One out of eight!

I am however, very pleased with who I ended up using. Instead of questioning the over engineered nature of my plans (like most of the others did), he and his two sons simply built a massively strong foundation.foundation1.thumb.jpg.a5d39a271e18e2c80ca8f5677b068d3f.jpg

foundation2.thumb.jpg.9f3016bc50704d5afd13a31c55894fd1.jpg

foundation3.thumb.jpg.941794d691d5f19d0d32474c59c23021.jpg

Waiting now for our nephew, who's a general contractor, to create a materials list from my plans, so I can price the lumber.

Edited by Fauxre
Text reformat

Share this post


Link to post
Share on other sites
With the help of my nephew, I was able to build and erect these two 12' wall sections on Saturday before the rain started.
Two more days of rain, then at least a week of dry weather ahead. Hoping for some major progress.
IMG_0158.thumb.jpg.f9c519a2fb80295764f9d3021e4a669d.jpg

Share this post


Link to post
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×