Nismo280zEd Posted September 22, 2010 Share Posted September 22, 2010 So I got kind of caught up in life and the Z was left neglected. She's been on stands for 3 years or longer when I started this crazy project. I finally did it though, S14 subframe into a 280z 2+2. Wider stance, disk brakes, CV upgrade, better suspension, etc. Here she is! Still alot of work to do but she is finally sitting on the ground again! Quote Link to comment Share on other sites More sharing options...
Nismo280zEd Posted September 22, 2010 Author Share Posted September 22, 2010 here are some fabrication shots cutting out the rear seat rest only to find more hidden rust (what a surprise in a Z!) then cutting floor board for lower mounts Not the prettiest bead but it's solid. I was really proud of how well I fit this tube to the sheet metal. mocking up the mount, still fitting the down tubes. Now there are two holes... downtubes fitted and welded and 3/16" plate being welded. Plate tacked in place, trying to finalize where the mount needs to be welded to the plate. Make shift mount welded another photo of welded mount, hard to get in there with welding helmet on. I'm proud of it, was my first time welding something structural I guess you could say. I'll accept criticism, but please be kind. -Ed Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.