This 260Z Build for the 2026 SEMA SHOW comes all the way from Great Britain.   Yorkshire Car Restoration is performing a Wild Build 

with a complete Liberty Walk Body Kit, Mercedes V8 Motor and featuring  Gull Wing Doors.   This company is well known car restoration

companies in Europe.   Since the car will represent them at a SEMA SHOW, you bet they will go all out.   I seen some of their previous 

restoration work and their workmanship is excellent.   The 260Z Project Car is from California and is pretty good shape.  The body seems to have relative only minor corrosion problems( even the floor pans probably don't need to be replaced.

 

https://youtu.be/QsBzrxPXM2c         Use this Link________________________________________

 

 

Edited by toolman
link connection
Link to comment
Share on other sites

PART 2-  Working on Gull Wing Doors

 

Demonstrating  the process of converting old door shell into the Gull Wing Door.   Fabricating new door frame from scratch is something to be hold.

The craftsmanship is excellent.   Their equipment is First Class and expensive.   Most body shops don"t have access to scuh expensive equipment

but work can duplicate by regular metal working tools but taking more labor and time.

 

Go to https://www.youtube.com/watch?v=LGEWDhsnRoE  for video

Edited by toolman
Link to comment
Share on other sites

Part-3   The Whole Plan is explained in this Video,

 

  Liberty Walk Body Kit and other exterior modifications are exposed.   But Time is the greatest enemy as the Sema Show is now less than a year away.

 

 go to ======https://www.youtube.com/watch?v=Merq9wrCZns  

 

Edited by toolman
Link to comment
Share on other sites

Part 4-Fixing the Gull Wing Doors and create special Interior design work

 

Finding a mistake costs a lot of correction time but when you doing a one of a kind project that is to be expected.

 

Go to---https://www.youtube.com/watch?v=itN99F8VKbQ

 

Edited by toolman
Link to comment
Share on other sites

  • 2 weeks later...

Part 6-Major Problem delays SEMA PROJECT

 

A major problem occurred in using a late model 370z suspension into this SEMA SHOW car.   Its wider size and different mounting points  created 

a major obstacle in this  construction,  Time is the Real Problem so this build will be exciting to watch.                                                                                                                                             

    https://ww.youtube.com/watch?v=EY6HaMiWFE48t=1686s

Edited by toolman
text correction
Link to comment
Share on other sites

  • 2 weeks later...
Posted (edited)

Part 7-More  work on the Rear of the Hatch area to install the 370 Rear Suspension  Subframe.   The Entire Rear Deck and Frame must be removed to make it fit.

The Workmanship is excellent and the Shop  High Tech Equipment makes this big job alot easier.

 

                              https://www.youtube.com/watch?v-EY6HaMiWFE48&t37s

 

 

----

Edited by toolman
text correction
Link to comment
Share on other sites

  • 2 weeks later...
Posted (edited)

Part 8-The Roll Cage is now installed so the Roof Area is  being prepared for the Gull Wing Door Build.  A Major Obstacle that I foresee the Transmission Tunnel and Firewall

may have to cut open because of the Huge Mercedes Motor and Transmission.  But if they are willing to Eliminating the Tunnel and Widening the Firewall Opening, they should not be a Big Problem.   

     

 

Edited by toolman
text correction
Link to comment
Share on other sites

PART 9-  ROLL BAR WELDED IN AND FABRICATING SQUARE TUBING INTERMEDIATE FRAME

 

         Thing are really moving along  now.  The Roll BAR is welded in and a frame connecting the existing  front and rear frame rails is being fabricated.

Excellent metal fabrication  is demonstrated.   i can for see that the original Transmission Tunnel will have to be removed to provide clearance for the Mercedes transmission.  e Firewall probably have to be widen also.

 

Link to comment
Share on other sites

Part 9-Middle Connection Frame Rails are fabricated and installed.

 

              In this this video, the Frame Rails connecting the Front and Rear Frame is being constructed and installed.   It is pretty heave duty but besides acting as  a

regular Body Frame, it must also support those Gull Wing Doors.   As the Roof will have be cut out for the doors too, extra support must be provided for door operation

and replace the roof structure.  I imagine the roll cage have a strong Center Roll Bar Section to accomplish this task.  The Doors will be a major problem with sealing and allowing adjustment of the Gull Wing Doors;

 

 

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...