Jump to content
HybridZ

LT1/T56 JTR mounts, R200 mount and alignment questions


Recommended Posts

Thanks, for the response, I am getting a quote to have both your mount with my modifications and the rear diff mount made as well. The two end pieces I will have made out of "U" channel of the same size as your box, weld the bolt plates to it and then cut and grind to match the floor contour and mate up to the sub frame rails which are already beffier than stock. Onec it is all fitted I will weld to the sub frame AND the floor. Either way I believe it is much stronger than bolting a stamped piece of flat stock through the floor!

I will post pics once the pieces are built.

Thanks,

Greg

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...