Jump to content
HybridZ

HIWAY ONE

Members
  • Posts

    68
  • Joined

  • Last visited

Everything posted by HIWAY ONE

  1. I paid $66 a piece loaded with pads at Advance Auto Parts
  2. Hey, your suspension looks really sweet! I hope mine looks half as good. What did you use to paint it?
  3. The 280zx block is the same as the 280z
  4. Urethane won't crack easily like fiberglass. Terry
  5. Thanks for the info. I'll check into it Terry
  6. Would this be a good replacement for the stock turbo? I'm looking to get to around 350 HP. Is this a good price? http://www.precisionturbo.net/ Thanks, Terry
  7. Thanks for the great summary. It's really helpful to have an overview in one place. Terry 1993 300zx 2+2 1974 260Z (soon to be ZT)
  8. Thanks for the great summary. It's really helpful to have an overview in one place. Terry 1993 300zx 2+2 1974 260Z (soon to be ZT)
  9. Use lots of liquid wrench and a propane torch. That's been my formula for a good part of the front suspension. Terry
  10. Stock 280zxt listed at 0-60 in 6.8 seconds http://datsunzclub.com/specifications.html Terry
  11. I don't know whether this is cost effective or not but check this http://www.jimcookracing.com/catalog/page24.html Terry
  12. SleeperZ If the stock l28et engine (which I just picked up from a junkyard) is rated at 180 hp, how are you getting 313hp by just dropping it in? Thanks, Terry
  13. Are you running the stock 14 x 6 wheels? I'm getting ready to buy some of Ross's stuff but I won't be buying new wheels until later in my project.
  14. Try this site, lots of good info http://www.geocities.com/zgarage2001/z.html
  15. a good source for replacing fasteners. I'm doing the entire front suspension and have had a bolt heads twist off, had to cut the nut on the tie rod off and had to drill the bolt that holds the steering knuckle and ball joint to the strut case. Is the dealership the only option or does someone like NAPA carry this stuff? Terry
  16. I started twenty years ago and after an 18 year break just restarted. During that time my basement wall caved in during a flood and you can imagine what happened to all my parts. On the other hand my neighbor started on a 6 month schedule in April. He is slightly behind schedule due to doing all of the body work himself. Terry 74 260Z 93 300Z
×
×
  • Create New...