Jump to content
HybridZ

Finally! Project milestone reached


Wagz

Recommended Posts

I finally got my 240Z/Velo Rossa project off of the rotisserie and back on the floor. It's seems like it's taken forever, but I finally have the sub-frame connectors and floor pans all welded up.

 

The entire underside of the car has gotten multiple coats of POR-15 and 3M rubberized under coating. The suspension components have all been sand blasted, struts sectioned, and everything has been painted. The car is on jackstands and I can start reinstalling all of the suspension, Hyper-Flex bushing kit and killer 5-lug, big brake conversion. :2thumbs:

 

On Sunday, I got a wild-hair and decided it was time to cut the top off in preparation to set the sexy Velo Rossa fiberglass on it. Man! was that nerve-wracking! :shock: Cutting the top off a perfectly good early 240 would cause the purists to have a contract taken out on me. My neighbors thought I was nuts.

 

It was cool, though. It's renewed my energy for getting this puppy on the road!

 

I'll have to post some pics later tonight.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...