Mikelly Posted September 18, 2001 Share Posted September 18, 2001 Guys, I didn't forget you guys. To say the least, I was very busy this weekend. I did get to do some welding the morning before my wedding, so I am working on stuf. I changed the Jig to get a more exact fit to the strut assembly, and I'm confident I've got something that will work. I'm working the sway bar mount and I'll be finishing it up and should have something to show you guys before I leave for my honeymoon on Saturday. I'll be finishing this project up when I get back, and now I'm pretty sure I can make 3-5 sets in a weekend, so turnaround should be fairly quick, once I get the sway bar mount sorted and the final gussets run. I did run the unit by the local fabrication shop and the structural design checked out with the engineer on hand. The guy was very complimentary about the overall design and adjustability of the unit and the beefy layout. He did give me advice on gussets and added fortification that I'll incorporate. Mike Quote Link to comment Share on other sites More sharing options...
Danno74Z Posted September 19, 2001 Share Posted September 19, 2001 Mike, Thank you for the update and naturally have a great time on your honeymoon Danno74Z Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.