Jump to content
HybridZ

Ivan280zt

Members
  • Posts

    1876
  • Joined

  • Last visited

  • Days Won

    6

Everything posted by Ivan280zt

  1. Engine back in the car for final round of fabrication Header and wastegate fit great Downpipe really takes up alot of space and when dump tube is finished that space will be pretty much non existent. Last one for the night
  2. Since 2jz seems to have alot of things that I wont be using I had Cory draw me few block off plates and we wanted to test them for fittment before order was sent out. Here are two of the "plates" getting fitted to verify clearance. Egr system There are few more but pictures came out really bad so I wont post those until real pieces came in. Next pictures are of the stock coolant inlet and outlet on the engine. Here you can see both of them and orientation of the lower one (which I ended flipping around thats coming up). -16 fittings welded on Insert your jokes here That nipple is not needed for anything so off it goes Back on the engine I flipped lower elbow 180deg so now it gives me better clearance and making lower radiator hose will be very simple. While ago I talked about adding another tab between throttle body brackets so that cable would not be hanging down its little things like that that really bother me so that will not be a problem.
×
×
  • Create New...