Jump to content
HybridZ

Ivan280zt

Members
  • Posts

    1876
  • Joined

  • Last visited

  • Days Won

    6

Everything posted by Ivan280zt

  1. Then we started working on throttle body cable I had old lokar (I think) cable from my old L28 setup so we ended reusing it for new setup but few things had to be changed around. Pedal had to be bent 45deg to the right so that cable would not bind up against intake manifold (bad angle coming through firewall). Once everything is done all the holes on the firewall will get filled in and minimized including this one Take one hammer + Torch = no cutting and welding : ) Tabs for the linkage brackets Thats where was left off for today more updates coming later next week.
  2. Today was one of those days... just way to tired to get out of the bed let alone go to the shop and work on the Z but when you dont have your own garage and your personal project car is taking shop space well you dont have much choice no lazy weekends for me. Drew was nice enough to come in and give me hand with some welding so between two of us (neither one wanted to be here today lol) we got few small things done. Here is what we were working on. Drew welding on intercooler mounts Here you can see vibrant vaccum reservoir mounted on the bottom of the intake manifold Time has finally come to get downpipe welded and she came out awesome! Downpipe mounted on the car with wastegate pipe mocked up
×
×
  • Create New...