Jump to content
HybridZ

Big Thanks to SYNLUBES - Doug Carrow


Mikelly

Recommended Posts

Doug came up on Saturday to give me a hand re-installing the drivetrain on my 1999C5 Vette. We worked for about 7 hours non-stop and finally got the drivetrail bolted in and the suspension back in place. Yesterday afternoon I took about 3 hours and finished up some of the wiring, the front sway bar, the alternator bracketry, and some ods and ends... I had to pull the intake back off to get to some line connections and found one of the gaskets on the intake puckering and NOT sealing properly, so I'll have to pick up a set of gaskets. Glad I could that.

 

Looks like about 8 more hours worth of work before the motor is started. I still need to PULL a header to re-install the starter, and I need to bolt the ABS block back into place, and install the accusump, oil cooler, and radiator/ fans...

 

Mike

Link to comment
Share on other sites

Two connecting rods let go father's day weekend at the Virginia International Raceway, on the grand east 4.2 mile road course. Catastrophic failure in the extreme. You can see pics of it at http://photos.yahoo.com/dat74z ... go to the vette pics folder.

 

New motor is in, and should be a real screamer. :shock:

Mike

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...