Well yesterday I loaded up all the parts in my 280Z (Spearco intercooler, piping kit, BOV, down pipe, boost controller, guage, Tokico struts, Eibach lowering springs) and will be taking her to Bloomington to get it all installed. She's loaded to the gills!
Hope they work fast, can't wait to get the car back. Next up will be wheels, flares, paint, maybe a small rear spoiler....then possibly in the future, bigger turbo, injectors, etc. etc. The list never ends!