Yoak Posted February 26, 2015 Author Share Posted February 26, 2015 (edited) I had to re do a section...with the cold temperatures I had some issues with pain curing...this despite run a jet heater and having the temperature in the 80s.. Pictures Taken January 2015 Edited February 26, 2015 by Yoak Quote Link to comment Share on other sites More sharing options...
Yoak Posted March 3, 2015 Author Share Posted March 3, 2015 Continued work on the rear hatch area...and some pictures of some of my first welds on the Z. I am brand new to welding so the process was interesting as I was now doing it for real. Pictures Taken: January 2014 Quote Link to comment Share on other sites More sharing options...
miky360 Posted March 3, 2015 Share Posted March 3, 2015 Love the way you document everything! Very detailed with High Res images! I wish I took the time and took pics of my build. Are you using POR15 for the interior? Quote Link to comment Share on other sites More sharing options...
Yoak Posted March 27, 2015 Author Share Posted March 27, 2015 Thanks for the compliment, I try to get as much detail as I can as you never know when you need to look back on something. I can't tell you how many times I reflect on something and go wonder what I was thinking..this helps that process. No, I did not use POR15 - I had considered it and ended up going with what I can get locally. I used a zinc based paint...which was fairly difficult to get off even with my blaster. I think do a layer of rustoluem bedliner (same as I used in wheel wells). The liner has a fine texture to it, similar to some to some of the ripple powder coatings I have seen. This was something I picked up from my jeep days and it generally held up pretty well in those condition so it just carried over. Quote Link to comment Share on other sites More sharing options...
Yoak Posted March 27, 2015 Author Share Posted March 27, 2015 Early Floor Pan Removal Pictures Taken March 2015 More Pictures: http://www.doitinadatsun.com/yoak/2015/03/240z-floor-pan-removal/ Quote Link to comment Share on other sites More sharing options...
Yoak Posted March 30, 2015 Author Share Posted March 30, 2015 More progress on the floor...the driver's side is out. I still have to cut out some bad sections near the pedals...but progress. Pictures Taken March 2015 More Pictures: http://www.doitinadatsun.com/yoak/2015/03/240-zflinstones-impersonation/ Quote Link to comment Share on other sites More sharing options...
Yoak Posted April 29, 2015 Author Share Posted April 29, 2015 Continuing to prep for floor board installation...have not determined if I am going to cut the original rail out or not. I have been using it as practice for welding as I am still learning. Pictures Taken April 2015 Same images this time on my site: http://www.doitinadatsun.com/yoak/2015/04/240z-floor-prep/ Quote Link to comment Share on other sites More sharing options...
Yoak Posted May 6, 2015 Author Share Posted May 6, 2015 Floor Prep work continues...I have removed the seat bracket and the frame rail is going to go (being replaced anyway). Because of the amount of rust I had to cut quite a bit of flooring out of the car The section near the drivers feat is going to be rather interesting to fix.Pictures Taken April 2014http://www.doitinadatsun.com/yoak/2015/05/240-floor-prep-continued/ Quote Link to comment Share on other sites More sharing options...
Yoak Posted May 13, 2015 Author Share Posted May 13, 2015 This engine was going into the 240z project but will be going into the 280ZX as the 240 has a long ways to go before it will be on the road again. Notice some of the interesting repairs done by a previous owner, especially the socket on the valve cover. As a result, I am going to be doing a complete rebuild on the engine which is a nice change all the body work I have been doing on the 240. Pictures taken April 2015 More pictures: http://www.doitinadatsun.com/yoak/2015/05/engine-tear-down-i/ Quote Link to comment Share on other sites More sharing options...
Yoak Posted May 23, 2015 Author Share Posted May 23, 2015 Continued tear down of the engine...it has a bit of a questionable past so I am doing a full rebuild. Pictures Taken April 2015 More Pictures at: http://www.doitinadatsun.com/yoak/2015/05/engine-tear-down-ii/ Quote Link to comment Share on other sites More sharing options...
Yoak Posted May 31, 2015 Author Share Posted May 31, 2015 Pictures Taken: May 2015 More Pictures: http://www.doitinadatsun.com/yoak/2015/05/engine-tear-down-iii/ Quote Link to comment Share on other sites More sharing options...
Yoak Posted June 27, 2015 Author Share Posted June 27, 2015 Pictures of what would turn out to be a bad block. Luckily I had a spare sitting around for a future build so this won't put me to far behind but I will need one for the 240Z rebuild. Pictures taken in May. Quote Link to comment Share on other sites More sharing options...
Yoak Posted July 7, 2015 Author Share Posted July 7, 2015 Early install pictures of my new frame rails from Z Man of Washington. My welds are going to win any words, but the tail is solid. In fact it is one of the things I wish I had left alone. I went back and tried to clean it up a bit and made it uglier (future pictures)...oh well as a rookie welder this is how you learn More Pictures: http://www.doitinadatsun.com/yoak/2015/07/floor-install-i/ Pictures Taken in June Quote Link to comment Share on other sites More sharing options...
Yoak Posted July 9, 2015 Author Share Posted July 9, 2015 More progress of the install. Pictures Taken June 2015 Quite a few More Pictures: http://www.doitinadatsun.com/yoak/2015/07/floor-install-ii/ Quote Link to comment Share on other sites More sharing options...
Yoak Posted July 26, 2015 Author Share Posted July 26, 2015 (edited) Continued Floor Progress Pictures Taken June/July 2015 More Pictures: http://www.doitinadatsun.com/yoak/2015/07/floor-install-iii/ Edited July 26, 2015 by Yoak Quote Link to comment Share on other sites More sharing options...
Yoak Posted July 31, 2015 Author Share Posted July 31, 2015 Finished with the Drivers side Pictures Taken in July More Pictures: http://www.doitinadatsun.com/yoak/2015/07/floor-install-iv/ Quote Link to comment Share on other sites More sharing options...
Yoak Posted August 2, 2015 Author Share Posted August 2, 2015 Passenger Floor Repair... Pictures Taken July 2015 More: http://www.doitinadatsun.com/yoak/2015/08/floor-install-v/ Quote Link to comment Share on other sites More sharing options...
Yoak Posted August 4, 2015 Author Share Posted August 4, 2015 (edited) Continued progress on the passenger side....note how much rust built up from having the rails sitting prior to installationPictures Taken July 2015More: http://http://www.doitinadatsun.com/yoak/2015/08/floor-install-vi/ ? Edited August 4, 2015 by Yoak Quote Link to comment Share on other sites More sharing options...
Yoak Posted August 9, 2015 Author Share Posted August 9, 2015 Continued progress...rust was from some water that happened to splash the metal while waiting for install. Pictures Taken July 2015 More Pictures: http://www.doitinadatsun.com/yoak/2015/08/floor-install-vii Quote Link to comment Share on other sites More sharing options...
Yoak Posted August 20, 2015 Author Share Posted August 20, 2015 Completion of the base installation of the new floor boards Pictures Taken: July 2015 More Pictures: http://www.doitinadatsun.com/yoak/2015/08/floor-install-viii/ Quote Link to comment Share on other sites More sharing options...