Even though its been cold I'm trying to get a little done here and there. The Limited slip rear should be in by the end of the weekend and the brakes completed. I then have to go to my friends house to finish putting the SDS system in. Hopefully by spring I will have a turbo car running. :wink:

Link to comment
Share on other sites

I have several excuses for very little progress on the Z.

 

1. Had to do a brake job on my truck. I hate drum brakes, they will not remain on the Z.

2. The garage is not heated and it has been way to cold.

3. Had to deal with large amounts of snow at the apartment building I own.

4. Rebuilding the bathroom in one of my units. New linoleum and tub-surround. Not difficult just time and money consuming.

 

I have made some progress though:

 

1. Removed exhaust mainfolds from LT1, found stripped hole.

2. Cut rusted areas from firewall and battery tray area on passenger side.

3. Started removing undercoating so I can expose bare metal to weld patches onto in wheel well and firewall. Also going to extend frame rails to back of car and install sub-frame connectors.

4. Stripped more paint from engine bay.

5. Collected more parts: R200, half-shafts and aluminum bell housing.

 

I guess I have made more progress than I realized, it just doesn't seem like it because I've avoided spending any more time than I have to in the garage lately due to the low temps.

 

Ken W.

Link to comment
Share on other sites

Not much going on with mine, the shop is taking up much of my time.

 

- Halfway through mounting the Recaro's, should finish those on Sunday.

- Just barely started on the cage install, more to come on Sunday too.

- Re-wiring job is 10% done, needs to wait for other things.

- Polished & ported intake is about 60% polished and 90% ported.

- New big NPR isn't here yet.

- No intercooler piping to speak of yet... sold my old stuff and the little NPR as a package.

- Body work/paint prep hasn't startd yet.

- Walbro fuel pump, 440cc/min injectors and new fuel rail are all ready to be installed.

 

I've got about 2 months to do all the above.... joy!

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.


×
×
  • Create New...