Jump to content
HybridZ

toolman

Members
  • Posts

    518
  • Joined

  • Last visited

  • Days Won

    7

Everything posted by toolman

  1. right side frame rail mocked up on jack stands. Shimmed to be level lengthwise and sideways. frame rail contoured to match firewall to provide easier welding top view of rail and firewall outside view of rail and firewall top inside view of right frame rail
  2. L/S frame rail cutoff using plasma cutter crossmember box removed from frame rail new frame-2 1/2 X 1/8" square steel tubing being setup notice gap-about 1" between square tubing and wheelwell. A filler piece fill this gap. the filler piece consists of 6" strip of 16 gauge sheet metal connecting tubing with existing wheel well housing the firewall end of the square tubing was capped with 1/8" metal plate. Notice the plate was made with about 3 /16" edge around it. This was to allow easier welding the tubing to the firewall. mockup of the connecting piece between the square tube frame and underfloor frame connectors One of the most difficult potion of the front frame construction will be connecting the crossmember to the square frame rail. The connector will need to be smaller than the width of the square tubing.
×
×
  • Create New...