Ok here's the latest changes.
I added webbing with an integral balance/vacuum tube.
The two manifolds will be connected with stainless braid hose. I straightened out the linkages. I added bosses on the bottom for a heat shield. I did away with my construction flange and added the final intake flange. You can't see this but I curved the portion just behind the butterflies on #1 and #6 internally to allow for a smoother transition into the port.
I ordered a set of stock injector hold downs and as soon as they arrive I can model the injector bosses.
I made the vacuum port 1/2†diameter. Any opinions if this will be large enough for power brakes and an idle valve?
At this point I plan to drive the linkages from the #6 butterfly. Anyone see any problems with that?
I'm going to start making the models into patterns working out the core and parting line issues. I also need to add any first grab flanges for the machining process. I'll post some pics of these as well.
Thanks again
Derek