Ok here is the deal. By the end of next week i will be done rebuilding the front frame rails, sub frames, and the extra ladder like system with the sub frames to make the car extra stiff. I am also going to rebuild the transmission tunnel to accommodate a 4l60e with room to spare. I will make and out line around the tranny with 1x1 square tubing and then build over the tranny with the same 1x1 to give it strength and i will add a back bone out of 1x3 that will go up to where the hood latch is and make a suport there to make a triangle around the engine bay. The hole system will tied in from the front frame rails the the rear frame.
I do want to know, do you think this will be a good way to go or should i rethink the hole thing. I am open to suggestions.
I for got to tell yall that there will be an 8 point cage in the car.