Mid-Feb and lots of work to go.
As of today, car is now apart of J.S.R.-jackstand racing. This past weekend, we did some prep work of the engine bay and ready were ready to install the JCI ls1 kit and the tranny crossmember was wrong! So basically another 2-4 week delay. In the mean time, I can prep the tranny tunnel and install the rest of the suspn. Also by the time the CM comes back from JCI, I should have brand new stainless steel brake/fuel/clutch lines from a company here in NY, Classic Tube. I donated hardlines and in return I get back free stainless lines. Basically I am going to take measurements from 1tuffz's car and have them bend the lines to the size n spec I need. Also I shold be ordering the AZ brake kit for the rear and q45 diff swap stuff. So trying to get her done.
Here is a pic of the car as of 2/10/07:
Flames_187 and 1Tuffz:
Engine Bay Getting Ready: