I've ordered and just need to go and pick up the new tensioner, pulley, and correct length timing belts for the front of the engine. Will post about that when it's completely sorted tomorrow. In the meantime I've been researching injectors. I need to work out how to use standard bosch injectors in the hayabusa throttle bodies so I can get some large E85 safe injectors I think. At least that's the current plan.
I also got a Victory spoiler from MSA and mocked it up this morning, so I will install that tomorrow too.
Looks dumb as hell with the small "steal-me" 14" rims, but should look ok with the Rotas (which are in storage until I get the VK56 conversion done).
My main emphasis at the moment though is on infrastructure. I'm doing house wiring work to be able to run the TIG I got, and also enrolling in a welding course so I have some idea what I am doing. Then I need to practice by building a bench for me to work on, and then I think I'll be ready to get started with the meat of this conversion. I also need to start measuring and CADing up the transmission adaptor.
Dave