Hey guys, I'm going to be doing a lot of work on my 240Z here for the next few months,(tearing apart the suspension, replacing everything with poly urethane bushings, and powder coating everything. Prob even going to go ahead and tear off all the undercoating and recoat with POR 15. . . ) and I was wondering a few things . .
1.) What are the best points to put the jack stands on a 240Z for an extended period of time?
2.) Should I put a piece of wood between the jack stand and these spots to evenly distribute the weight?
3.) Is there some kind of limit to how long I should keep my car up on stands?
4.) Can someone post pictures of the spots for me? No real need, but I'm sure someone will benifit from them.
Thanks guys!