Here is some progress pics...
Polished the center cover, welded 12an bungs on valve covers (not pictured), welded -10an bung on the bottom of the intake manifold for the air regulator, bead blasted steering rack, rebuilt with new rods and boots, installed the ACZ lower control arms i had on my tube chassis 280z, ran all the plumbing, bent the front oil drain lines so they would fit, and so much more i cant even type now im so tried ... next up fuel lines, and modify this intake manifold so it will clear the fender. i could wack it with a hammer one time on the fender but i think i will take a band saw and cut the manifold 1/2 way though and bend it out then weld it up.