24 valves removed, 24 valves hand lapped, 24 valves re-installed. another thing added to my list of things i don't want to do again. Head is off to get decked today along with getting the rotating assy in the turbo balanced. bearings are here, oil pump cleaned inspected and reassembled.
Things needed,
1. Set of rings
2. Head gasket
3. Oil pan
4. Rods (I have a stock set but have decided i don't want to limit engine with rods)
5. Misc gaskets
Hope to be completely reassembled by the end of march and ready for first TnT in april.