Well accomplished my goals. One night cut the rings and install rings, once I got my block back, it cheked out okay no cracks in the cylinder.
Second night after picking up the two balanced pistons and the heads, Install crank, and pistons.
Third night finshed up bottom end, installed timing chain, crank hub, checked TDC, installed head studs and installed heads.
Heads were warped, and had a bent valve.
Today, assembled valve train, installed transition plates and intake, starter, from motor plates, water pump, oil, primed oil pump, installed motor in car, installed blower, set timing, adjusted valves, checked for fuel leaks and busted it off, set timing and let run a while.
Did have a oil leak, resolved it I hope.
All went well, no problems as of yet. Tomorrow let run some more, check for oil leaks and clean up the shop. Take Monday off, and get ready to go to the dyno, if we don't blow it we will be at SEZ.
John