I'm wanting to get a little out of order at this point. Here's my problem.
I'm taking the shell across town soon to my welders shop. He will be putting on the bad dog frame rails, welding up all the holes, fabricating the corvette tail lights, and most importantly fabricating and welding on the metal flares. Unfortunately it will be a few months before I have money to throw at it. Wheels and tires will run around 1500, and the coil overs will run about a thousand. I want to run the gc setup, and the rbr 8.5's with maybe 275 out back and 255 or do up front. Is it imperative that all that is setup before building the flares?
I think I already know the answer, but has anyone done the cutting and flares before the other stuff?